This video shows how to do a tailings capacity calculation for a tailings dam using discharge points at a fixed elevation/location, and with a target volume of water in the pond. To goalseek for a pond elevation, a target pond volume and an initial pond elevation are entered.
Pre-requisites
- Grid with a dam
- Tailings properties defined
- Discharge points created
Commands used
- Ooze/Single stream deposition/Fixed pond volume/As-drawn